ENDEAVOR ENERGY RESOURCES

4000HP, 690 Volt E-Rig Harmonic Filter Mirus International 4000HP Harmonic E-Rig Filter which will be integrated on a Power skid with Switchgear and Transformer for a Permian application. We developed this design specifically for the high Background Source Voltage Distortion of these applications. This specific unit is designed for a hard bus close couple to the transformer and rough neck … Read More

The City of Houston – Water Plant

Northeast Water Purification Plant (NEWPP) Expansion Project The City of Houston’s Northeast Water Purification Plant (NEWPP) Expansion Project is a design-build project that will add 320 million gallons per day (MGD) by 2024 to the existing water plant’s capacity. The expansion project will allow the City and the regional water authorities to meet projected demands, while fulfilling requirements set by … Read More

Occidental Permian – Mirus Filter Install

Installation of 300HP, 480V Mirus filter on Baker Hughes VFD The intent of the testing protocol was to install a Mirus Lineator ED series Wide Spectrum Harmonic Filter on ESP applications within the OXY system.  The following discussion will be based on a 55 Hz output inverter frequency. Testing was done at 60 Hz, but we wanted to verify performance … Read More

Occidental Permian – RVSS Install

Installation of 1000HP Solid State Starters in Integrated Control Building Occidental’s U.S. business is focused in the Permian Basin of West Texas and southeast New Mexico, one of the largest and most active oil basins in the United States. This accounts for approximately 30 percent of the total U.S. oil production. As the No. 1 producer in the Permian Basin … Read More